Technical intro

WEESION / EKO CONCEPT

Weesion’s philosophy of sustainability

Less hardware. Less material. More intelligence. Discover the Weesion EKO concept.

01 / EKO CONCEPT

The underlying mindset

The conventional approach to a “green” building often means more devices, more cables, more material and higher investment costs. We take the opposite approach. Instead of adding more and more hardware and associated wiring, we focus on using our own technology to create EKO concepts.

  • W10 modules instead of small control panels and wiring.
  • Weesion APP instead of wall controllers.

Less hardware. Less material. More intelligence.

02 / EKO CONCEPT

How do W10 series modules represent our philosophy?

Their development focused on replacing several devices with a single module while reducing wiring and installation materials to a minimum. The resulting modules embody our philosophy and transform design, construction and operation towards greater sustainability.

03 / EKO CONCEPT

One module instead of a control box

A W10 module replaces electrical control boxes and their terminals, circuit breakers, relays, transformer and DDC controller. This also removes the associated wiring and mounting materials that connect the electrical box to the air-conditioning equipment and link the units within a space.

04 / EKO CONCEPT

A change in the construction process

One W10 module is installed in each air-conditioning unit to provide all the required room functions. Only one communication cable and one power cable are installed between units.

05 / EKO CONCEPT

A change in the design process

The designer no longer needs to create different electrical control-box diagrams. Adding a W10 module symbol to each unit is sufficient to provide the required functions.

06 / EKO CONCEPT

Functional testing and peripheral connections

Air-conditioning units combined with W10 modules form communicating assemblies that the integrator can put together on a workbench, connect to peripherals and test. Before a unit is installed in its final position, it has already been pre-commissioned and its main functions tested.

07 / EKO CONCEPT

Refurbishment and a new tenant

Less wiring means less work during refurbishment. If the partition layout changes, the integrator simply regroups the air-conditioning units.

The next step in your project.

01

BMS integration

BACnet MS/TP and Modbus RTU. An open path to your BMS.

Read article
02

Use cases

Control offices, retail premises and other spaces with W10 modules and Weesion APP.

Read article